Konstruksi Project Stages
Konsep
The Concept stage of construction involves defining the scope of the project, conducting feasibility studies dan deciding whether to proceed. For larger projects, this is when master planning takes place. Concept may also include rezoning, especially if the intended project’s use falls in a different category to the current land use restrictions, adan appointing a designer through design tender. In mining projects, exploration and scoping studies occur, which involve applying for permits to conduct mineral explorations (sampling, mapping, surveying, drilling, etc.).
- Design Tender / Competition
- Design Contract Awarded / Competition Winner
- Perencanaan Awal
- Zonasi ulang
- Pertambangan, Eksplorasi Minyak & Gas
- Studi Penjajakan Pertambangan, Minyak & Gas
Desain & Dokumentasi
During the Design and Documentation stage, the focus shifts to defining how the project integrates into the local area, which is crucial for obtaining design and building approval. This phase involves in-depth planning and drafting of architectural drawings, specifying both exterior and interior products, engaging consultants and engineers, and preparing comprehensive tender documentation.
For mining projects, assessing the mine’s feasibility and commercial viability, applying for environmental permits and mining licenses, and undertaking detailed engineering designs and documentation all fall in this stage.
- Plans in Progress
- Development Application / Resource Consent Application
- Development Approval / Resource Consent Granted
- Construction Certificate Submitted / Building Consent Application
- Construction Certificate Approved / Building Consent Granted
- Appeal Lodged*
- Dokumentasi Sedang Berlangsung
- Mining / Oil & Gas Pre-Feasibility Study
- Mining / Oil & Gas Definitive Feasibility Study
Pra-Konstruksi
Pra-Konstruksi involves appointing a main contractor, sometimes via tender. Tendering is a competitive process itu involves inviting selected firms ke Submit a proposal or publishing an advertisement itu invites all contractors that meet certain licensing requirements or capability levels. The developer may opt to first invite firms ke Submit an expression of interest (EOI), before shortlisting preferred contractors and conducting a comprehensive evaluation based on factors like price, quality, experience, Timeframe and the choice of subcontractors.
Alternatively, a main contractor may be directly appointed without the project going to tender.
- Expressions of Interest Δ
- Disebut Tender
- Tender Called - Tenderers Listed
- Tender Closed - Contract Not Yet Awarded
- Tender Closed - Tenderers Listed
- Contract Awarded / Builder Appointed
Konstruksi
During the Construction stage of a project, subcontractors are selected and building works commence. This phase involves boots on site, and managing construction budgets and timeframes, all leading to project completion and handover to the client.
- Kontraktor Utama Di Lokasi
- Pekerjaan Situs Dimulai
- Konstruksi Dimulai
- Subcontractor Tender Called**
- Subcontractor Tender Closed**
- Subcontractor Tenderers Listed**
- Subcontractor(s) Appointed**
*Not available for Asia projects.
**Not available for ANZ or USA projects.
Δ Substage not applicable in certain projects.