施工 Project Stages
構思
The Concept stage of construction involves defining the scope of the project, conducting feasibility studies 和 deciding whether to proceed. For larger projects, this is when master planning takes place. Concept may also include rezoning, especially if the intended project’s use falls in a different category to the current land use restrictions, and appointing a designer through design tender. In mining projects, exploration and scoping studies occur, which involve applying for permits to conduct mineral explorations (sampling, mapping, surveying, drilling, etc.).
- Design Tender / Competition
- Design Contract Awarded / Competition Winner
- 前期規劃
- 土地用途改劃
- 採礦、石油和天然氣勘探
- 採礦、石油和天然氣範圍研究
設計與文檔
During the Design and Documentation stage, the focus shifts to defining how the project integrates into the local area, which is crucial for obtaining design and building approval. This phase involves in-depth planning and drafting of architectural drawings, specifying both exterior and interior products, engaging consultants and engineers, and preparing comprehensive tender documentation.
For mining projects, assessing the mine’s feasibility and commercial viability, applying for environmental permits and mining licenses, and undertaking detailed engineering designs and documentation all fall in this stage.
- Plans in Progress
- Development Application / Resource Consent Application
- Development Approval / Resource Consent Granted
- Construction Certificate Submitted / Building Consent Application
- Construction Certificate Approved / Building Consent Granted
- Appeal Lodged*
- 文件編製進行中
- Mining / Oil & Gas Pre-Feasibility Study
- Mining / Oil & Gas Definitive Feasibility Study
施工前
施工前 involves appointing a main contractor, sometimes via tender. Tendering is a competitive process 那 involves inviting selected firms 到 秒ubmit a proposal or publishing an advertisement 那 invites all contractors that meet certain licensing requirements or capability levels. The developer may opt to first invite firms 到 秒ubmit an expression of interest (EOI), before shortlisting preferred contractors and conducting a comprehensive evaluation based on factors like price, quality, experience, 噸imeframe and the choice of subcontractors.
Alternatively, a main contractor may be directly appointed without the project going to tender.
- Expressions of Interest Δ
- 招標
- Tender Called - Tenderers Listed
- Tender Closed - Contract Not Yet Awarded
- Tender Closed - Tenderers Listed
- Contract Awarded / Builder Appointed
施工
During the Construction stage of a project, subcontractors are selected and building works commence. This phase involves boots on site, and managing construction budgets and timeframes, all leading to project completion and handover to the client.
- 主體工程即將展開
- 其他地盤工程展開
- 主體工程展開
- Subcontractor Tender Called**
- Subcontractor Tender Closed**
- Subcontractor Tenderers Listed**
- Subcontractor(s) Appointed**
*Not available for Asia projects.
**Not available for ANZ or USA projects.